An extraordinary portfolio of national and state highways
Vijay Nirman offers world-class solutions for the construction of roads and bridges, relying on company’s many decades of work experience, team expertise, aesthetic excellence, and cost efficiency. The company takes immense pride in creating an extraordinary portfolio of national and state highways that has contributed substantially to the planned development across many regions of India – where it was needed the most.
Major Ongoing & Completed Projects
Client | Name of work | Location | Scope of work | Value |
---|---|---|---|---|
Jaiprakash Associates Ltd. | Construction of interchange, bridges and vehicular underpassess for package B-6(km 138.000 to km 165.537) for Taj Expressway | Noida , Uttar Pradesh | Bridges & vehicular underpasses including piling with hydraulic rigs ,substructure with RCC , superstructure with PSC.Minor bridges -8 nos,Major Bridges-1 VUP-8 nos,interchange -3 nos | Rs 340 Crores |
Sadbhav Engineering Ltd. | a) Design & Construction of Elevated Viaduct from Mundka to Tikri border, siding at Tikri Border and four elevated stations viz., MIA, C\Ghevara, Tikri Kalan and Tikri Borderb)Four laning of Rohtak to Hissar section of NH-10 (from km 87+000 to km 170+000) including connecting link from Km87+000 (NH-10) to Km 348+000 (NH-71) to be executed as BOT (Toll) Projet on DBFOT c) Construction of roads and building works for Rajura Check Post, Kharpi Check and Bilioli Check Post d)Structure work for Km.0.000 to Km. 57.000 of the chhindwara Ring Road on DBFOT |
Maharastra, Madhya Pradesh, Hayana , Delhi | roads for Rajura Check Post, Kharpi Check and Bilioli Check Post and Structure work for Km.0.000 to Km. 57.000 and Four laning of Rohtak to Hissar section of NH-10 and Elevated Viaduct from Mundka to Tikri border,including architectural finishing, water supply, sanitary installation, drainage works and roofing works of stations on Mundka-Bahadurgarh corridor of Phase – III of Delhi MRTS | Rs 294.67 Cr |
Utility Energy Tech Engineers Pvt Ltd | Construction of NH-67in Tamil Nadu of Trichy -karur Section from Km 190+000 to 218+041 | Karur,Tamil Nadu | Km190+000 to 196+400 (6.40 Kms) – Widening and Strengthening of existing two lane roadKm196+400 to 203+300 (6.90 Kms) – Widening and Strengthening of existing carriageway from 2 lane to 4 lane.
Km 203+300 to 218+000 (14.728 Kms) – New Construction of 4 laned Bypass. |
205.00 Crores |
GMR Infrastructures Ltd. | Development of Outer Ring Road (ORR) on Design, Build, Finance, Operate and Transfer (DBFOT) – Construction of Major structures from KM 0.00 to KM 12.00 (Pkg-2). | Chennai,Tamil Nadu | Major Bridges ,including piling rigs , substructure with RCC & superstructure with PCCgirder including lunching ie IC-2nos,Flyover-4nos,major bridge -6nos,&minor bridge-02nos VUPs -6nos, | Rs 179.32 Crores |
GMR Infrastructures Ltd. | Construction and improvement of 4 lane the existing 2 lane Section from Thindivanam 121 km to Ulundurpet Km192.250 on NH-45 in the state of Tamil Nadu | Villupuram,Tamil Nadu | Major Bridges ,including piling, substructure with RCC & superstructure with PCC girder including lunching ,3 laned Major river -6 no, 6 lane grade separtor -1no,2 lane Road over bridge -1 no,4 lane Road over bridge -2 no, | Rs 160.50 crores |
M/s.Utility Energytech and Engineers Pvt. Ltd. | Construction of Salem-Ulundurpet Section from (Km0+313 to Km62+250) of NHAI Project on NH-68 | Salem-Ulunderpet,,Tamil Nadu | Widening to 4 lane & strengthening the existing 2 lane carriageway. | Rs 112 crores |
Sadbhav Engineering Limited | Construction of Tapi Bridge 600.4m length at Km211/400 on a fixed price lump sum turnkey basis | Maharastra | Bridge works | Rs 86.57 crores |
M/s.Soma Enterprise Limited, | Construction of the six laning of Panipat-Jalandhar Section of NH-I from Km 310.000 to Km 387.100 (Length – Km – 77.100) in the State of Punjab, all structures/bridges (Reach-4 & 5) | Panipat-jalandhar,Punjab | Road,Structure & bridges | Rs 86.57 crores |
Metropolitian Transport Project ( Railways ) | MRTS- Phase -II Extension from velachery to st thomas mount – Propoaseds elevated superstructure consisting of PSC box grider U type PSC deck slabs and RCC works , protctive coating to PSC girdres etc over already constructed substruture between ch 19.750 and ch 23.350 | Chennai ,Tamil nadu | Elevated superstructure consiting of U type PSC spans & Box girders. | Rs 77.6 crores |
S D M Projects Pvt. Ltd. | NHAI Project on NH-67 in Tamilnadu State, Construction and maintenance of existing 2 land highway to 4 lane km 135.00 to 218.215 | Tamil nadu | Widening to 4 lane & strengthening the existing 2 lane carriageway. | Rs 112 crores |
RITES LTD | Construction of proposed major bridges as 1×16.42m + 2×19.10m + 1×34.92m + 2×19.10m + 16×30.175m + 1×40.45m + 1×19.10m +2×30.175m PSC box / I-Girder with pile foundations for coal conveyor system and for carrying pipe line passing across railway lines between attipattu pudunagar – Ennore Stations and Ennore Creek, Buckingham Canal Duly connecting vallur thermal power plant of M/s.NTECL and North Chennai Therminal power station at Vallur | Vallur, Tamil nadu | Major Bridge | Rs. 41.19 Crores |
Highways Department- Projects circle- chennai 25- Project division -1 chennai -16 | Construction of Fly over at Ennore Ring Road – | Chennai | Flyover,ROB,Three lane bridge | 72.31Cr |
Oriental Structural Engineers Pvt Ltd | Stuctures on NGBP Project, Package 2,3,4, & 5 | Nagpur | National By Pass – Kamptee – Kanhan by Pass – Construction of Structures | Rs . 40.40 Crores |